| Location: | Bardonecchia (TO) - Viale della Vittoria |
| Sole Contractor: | Mr. Massimo Monferino, engineer |
| Designers: | Sintecna srl Architecture: Paolo Napoli, engineer - Orza, engineer Buildings: Paolo Napoli, engineer - EL srl, METEC srl, IMPRO srl |
| Cost of work: | 26.95 million euros Co-financed by the City of Torino: 6 million euros |
| Work: | Work is expected to begin in March 2004 |